Skip to content
Annex B.pdf

Document -

Annex B.pdf

go to media item
License:
Media Use
The content may be downloaded by journalists, bloggers, columnists, creators of public opinion, etc. It can be used and shared in different media channels to convey, narrate, and comment on your press releases, posts, or information, provided that the content is unmodified. The author or creator shall be attributed to the extent and in the manner required by good practice (this means, for example, that photographers should be attributed).
File format:
.pdf
Download

Related content

With a high degree of automation in T4, passengers can choose to self-serve throughout their departure journey, from check-in all the way to boarding.

Fact Sheet: Changi Airport Terminal 4 welcomes passengers from 13 September 2022


Changi Airport Group (CAG) welcomes passengers at Terminal 4 (T4) from 13 September 2022. T4’s reopening will ensure that the air hub can meet the increasing demand for air travel as the year-end travel peak approaches. Since May 2022, CAG has been conducting operational readiness trials with airlines and airport partners to ensure the smooth restart of operations in T4. With a capacity of 16