Skip to content
Annex A.pdf

Document -

Annex A.pdf

go to media item
License:
Media Use
The content may be downloaded by journalists, bloggers, columnists, creators of public opinion, etc. It can be used and shared in different media channels to convey, narrate, and comment on your press releases, posts, or information, provided that the content is unmodified. The author or creator shall be attributed to the extent and in the manner required by good practice (this means, for example, that photographers should be attributed).
File format:
.pdf
Download

Related content

T4 Departure Hall - highly automated with self-service check-in kiosks and bag drop machines

Changi Airport to resume T4 operations on 13 September 2022 as travel recovery picks up pace

SINGAPORE, 22 July 2022– Changi Airport Group (CAG) today announced that operations at Terminal 4 (T4) will resume on 13 September 2022, following a more than two-year hiatus due to the Covid-19 pandemic.
With a capacity of 16 million passengers per annum, the reopening of T4 will add to Changi Airport’s capacity, ensuring that the air hub can meet the increasing demand for air travel, and sup