Skip to content
Enjoy the first TV lounge on an LED wall in Changi

Image -

Enjoy the first TV lounge on an LED wall in Changi

go to media item
License:
Media Use
The content may be downloaded by journalists, bloggers, columnists, creators of public opinion, etc. It can be used and shared in different media channels to convey, narrate, and comment on your press releases, posts, or information, provided that the content is unmodified. The author or creator shall be attributed to the extent and in the manner required by good practice (this means, for example, that photographers should be attributed).
File format:
.jpg
Size:
994 x 663, 205 KB
Download

Topics

Related content

 Engineering and expansion works at Changi Airport Terminal 2 completed

Engineering and expansion works at Changi Airport Terminal 2 completed

SINGAPORE, 28 September 2023 – Changi Airport commences operations in the northern wing of Terminal 2 (T2) today after three and a half years of engineering works to extend the life of critical systems, and expansion works to bring Changi’s overall capacity to 90 million passengers per annum (mppa). T2’s handling capacity has increased by five mppa to 28 mppa.
This boost in capacity is timely